Search
- Cost Estimate
As reported by the House Committee on Transportation and Infrastructure on May 8, 2024
- Cost Estimate
As ordered reported by the House Committee on Natural Resources on September 20, 2023
- Working Paper
How CBO Uses the ReEDS Model to Analyze Policies in the Electric Power Sector: Working Paper 2024-02
This working paper provides an overview of CBO-ReEDS, an adapted version of the National Renewable Energy Laboratory’s Regional Energy Deployment System (NREL’s ReEDS) model for analyzing policies in the electric power sector.
- Report
CBO describes economic outcomes of veterans who are Black, male, and working age and whose service began during or after 1990. CBO compares the outcomes of that group with outcomes of Black nonveterans and White veterans from 2017 to 2019.
- Report
Eric J. Labs, an analyst in CBO’s National Security Division, testifies before the House Homeland Security Committee's Subcommittee on Transportation and Maritime Security on May 7, 2024.
- Cost Estimate
As reported by the House Committee on Science, Space, and Technology on September 22, 2023
- Report
CBO estimates that construction of 18 medium landing ships would cost between $6.2 billion and $7.8 billion in 2024 dollars. CBO’s estimates range from two to roughly three times the Navy’s current estimates.
- Report
Between 1980 and 2022, the shipbuilding composite index grew an average of 1.2 percentage points faster per year than the GDP deflator did. Looking ahead, a gap of roughly 1 percentage point would be consistent with historical experience.
- Cost Estimate
As ordered reported by the House Committee on Natural Resources on October 26, 2023
- Report
The federal budget deficit increases significantly in relation to gross domestic product over the next 30 years, in CBO’s projections, pushing federal debt held by the public far beyond any previously recorded level.